Bracebridge and Muskoka Lakes Secondary School was a new construction project in 2006. Tri-Tech Pinnacle Group managed the 160,000 sq. ft. roofing project from start to finish. Project Date: 2006 Location: 100 Clearbrook Trail, Bracebridge Project Type: New Construction Roof Type: Single-Ply TPO Roof Area
Tri-Tech Pinnacle Group updated the building envelope of St. Augustine Catholic High School by replacing the metal siding on all exterior walls with new metal cladding and 4” insulation. Project Date: May 2019 Location: 2188 Rodick Rd, Markham, Ontario Project Type: Building Envelope – Siding Replacement Roof Area
Tri-Tech Pinnacle Group conducted building envelope improvements for this school, including upgrades to masonry, board insulation, air and vapour barrier and aluminium windows. Project Date: November 2013 Location: 150 Aldergrove Dr., Unionville, Ontario Project Type: Building Envelope – Air Barrier Roof Area and Size: All exterior walls
This window replacement project, completed by Tri-Tech Pinnacle Group, involved the supply and install of new window and door assemblies including all sealants, closures and membranes. Tri-Tech supplied aluminium windows and doors, including metal panels, perimeter trims, sills and stools, window installation hardware and accessories,